Why use BIM
Building information modelling is a very useful and important technology available that changes the way construction projects take place and restoration work is carried out. What that means for people, is that we have better buildings in better locations and that our infrastructure is upgraded with industries that are more profitable and efficient.
How has BIM changed the way building projects move from conception and design points to solutions in the real world?
Capturing the reality
Visual data collection is very useful for construction projects. 3D modelling programs and technologies such as drone photography can be used to improve BIM technology. This allows designers to collect data from the urban environment in a way that is unprecedented. Now it takes very little time to create 3D models so that it can change the way companies manage and process vast infrastructure and build projects. For a provider of BIM Technology, visit https://www.bimtech-eng.com/
Keep construction costs under control
The use of BIM can predict conflicts that arise, such as conflicts between plumbing, risers, electric closets, work channels and penetration, for example. Problems in construction can be identified, diagnosed and repaired before construction begins, avoiding changes during fieldwork and associated costs incurred. This saves a lot of time and eliminates the need for material changes which ultimately adds a sizable amount to the project costs.
Increase collaboration
One of the most positive aspects of BIM technology is its ability to increase understanding and collaboration between various parties involved in working on the same project. There are many unique and important sharing capabilities with this technology that cannot be found or implemented when using traditional images.
Simulate and visualize
In fact, we all live in the 4D world and not the 3D world as we think. The 4th dimension is time and using 4D BIM adds that the dimension is important, allowing collaborators to see each development phase and site building based on what is currently happening there. This offers a future view after sorting and allows further scheduling of labour and materials to be made in advance and more accurately. This level of real-time adaptability saves time and money.
Improved order
This allows for maintenance or adaptation of the project schedule due to in-depth knowledge of the project sequence. By combining the activity schedule with the BIM model, the project manager can oversee development and validate the accuracy of the sequential plans contained in the schedule.
Leave a reply